Aerco ProtoNode Gateway Rev 1 (with internal LEDs) Uživatelský manuál Strana 3

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 64
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 2
Page 3 of 64
USER MANUAL
AERCO/ProtoNode Gateway
OMM-0080_0D
AERCO International, Inc. 100 Oritani Dr. Blauvelt, New York 10913 Phone: 800-526-0288 VD2:011712
1
GF-129
TABLE OF CONTENTS
1. Introduction ............................................................................................................................ 5
2. Bacnet/LONWorks Setup through Protocessor Protonode RER/LER ............................... 7
2.1 Installation Steps For The Customer ........................................................ 7
2.2 Record Identification Data ...................................................................... 7
2.3 Configure the DIP Switches ..................................................................... 7
2.3.1 Setting the Node/ID Device Instance (DIP Switch A0 A7) for BACnet MS/TP,
BACnet/IP, and Metasys N2 ................................................................................................ 7
2.3.2 Setting the Serial Baud Rate (DIP Switch B0 – B3) for BACnet MS/TP & Metasys N2 .... ..7
2.3.3 Using S0 S3 bank of DIP Switches to select and load Configuration Files ............ 8
3. Interfacing the ProtoNode to The AERCO Control System (ACS, BMS II, or BMS) ....... 11
3.1 ProtoNode RER and LER showing connection ports ................................ 11
3.2 ACS/BMS II/BMS Wiring Connections to ProtoNode RER and LER ........... 11
3.3 Modulex BCM ...................................................................................... 13
3.4 ECS .................................................................................................... 13
3.5 C-MORE .............................................................................................. 14
4. Connection from ProtoNode RER to BACnet MS/TP and Metasys N2 networks ......... 15
4.1 Wiring the ProtoNode RER to RS-485 Field Protocol ............................ 15
4.2 Wiring the ProtoNode LER Field Port to a LonWorks network ............... 15
4.3 Power-Up the ProtoNode RER or LER ................................................ 15
4.4 Commisioning the ProtoNode LER on a Lonworks network ................... 16
4.5 Sending Write Values ........................................................................ 16
5. Install and Run the Utility Software to Setup ip Address for bacnet/IP.......................... 17
5.1 Connect the PC to the ProtoNode via the Ethernet port ......................... 17
5.2 Connect to the ProtoNode using RUI (Ruinet) ........................................ 18
5.3 Set IP Address for BACnet/IP ............................................................... 18
Appendix A. Troubleshooting Tips ......................................................................................... 20
A.1 - LED Diagnostics for Modbus RTU Communications Between the Protonode
and AERCO’s Boiler Controllers ................................................................... 20
A.1.1 - ProtoNode LER - LED Locations and Functions .................................................... 20
A.1.2 - ProtoNode RER - LED Locations and Functions .................................................. 22
A.2 - Troubleshooting Procedures for Connection Problems .......................... 23
Appendix B. Reference ............................................................................................................. 25
B.1 Specifications ...................................................................................... 25
B.1.1 Compliance with UL Regulations ............................................................................. 25
B.2 Address DIP Switch Settings ................................................................ 26
Appendix C. Configuration Information ................................................................................. 33
C.1 Default Modbus RTU COM Settings for AERCO Controllers ..................... 33
C.2 BACnet/IP, BACnet MS/TP, Metasys N2, and LonWorks Points List ......... 34
C.2.1 - Four C-Mores and One ACS/BMS II/BMS ............................................................. 34
C.2.2 - Eight C-Mores and One ACS/BMS II/BMS ............................................................ 36
C.2.3 - Twelve C-Mores and One ACS/BMS II/BMS ......................................................... 40
C.2.4 - MLX and One ACS/BMS II/BMS ............................................................................ 45
C.2.5 ECS…………………………………………………………………………………...….47
C.2.6 - Twelve C-Mores, Six ECS/SP, Four Modulex and Two ACS/BMS II/BMS ............ 48
Appendix D. Limited 2 year Warranty .....................................................................................
63
Zobrazit stránku 2
1 2 3 4 5 6 7 8 ... 63 64

Komentáře k této Příručce

Žádné komentáře